![Korosh slaughterhouse waste conversion system Korosh slaughterhouse waste conversion system](https://www.nosazsanat.ir/wp-content/uploads/2021/10/p1.jpg)
Korosh slaughterhouse waste conversion system
The waste conversion system of Korosh slaughterhouse with a capacity of 30 tons per day is ready to be launched in Semnan. ...
![Pishtaz Noor project in Ahvaz city Pishtaz Noor project in Ahvaz city](https://www.nosazsanat.ir/wp-content/uploads/2021/10/p4.jpg)
Pishtaz Noor project in Ahvaz city
Olive work ...
![Shirvan swallow project Shirvan swallow project](https://www.nosazsanat.ir/wp-content/uploads/2021/10/p3.jpg)
Shirvan swallow project
The cold room line of the Prasto Shirvan project is ready for operation with an area of 1200 meters....
![Taimaz Gorgan project Taimaz Gorgan project](https://www.nosazsanat.ir/wp-content/uploads/2021/10/p2.jpg)
Taimaz Gorgan project
A fully automatic stomach emptying line of 6000 pieces per hour was launched in Gorgan along with the automatic transfer of Taimaz project. ...